» Cairo – Alexandria Fly – Over Bridge
The Cairo-Alexandria Fly-Over was severely damaged in an unfortunate fire. As a result, the most prestigious repair and renovation companies in Egypt were invited to participate in the reconstruction of this vital bridge.

» Rehabilitation of the fifth Zone Buildings
The project is working to adapt the existing buildings in the Golf area from public housing to high quality finish housing and they will be structurally upgraded, to cope with the increased loads.

» Makaram El Akhlak Mosque
Due to the new drainage project in Shobra area, the ground water table in the area was dramatically reduced, which caused a sudden settlement of the mosque foundation.

» Golden Pyramids Plaza
Due to the size and nature of this project it was divided into two phases, the concrete works done by Alexandria Contraction Co. and the finishing work done by CCC Orascom J.V.

» Ismalia Temsah Lake Bridge
A very buzy and strategic bridge, that needed immediate repair in a very compressed time frame.

 

 
 

Home | Company Background | Vision & Growth | Objectives | Working Methodology | Message from the Chairman 
Antiquities Repairs | Civil Repairs | Civil Construction | Soil Reinforcement Joint Ventures | Careers | Contact Us
© All rights reserved for Rowad Modern Engineering. Site created by INTERNILE